Skip to content
शिक्षाby Grow10x
RoboticsG12-P14

Integration and Acceptance Testing

An integrated build that passes its own acceptance tests, with every failure fixed or recorded.

  • Class 12 · Integrate
  • Sessions 66-70 · Weeks 33-35
  • In Innovation
  • Hands-on build
Class 12 showcase
Sound-Aware Smart Room
The five-session sprint

Session by session

  1. Session 66 · Ask & understandWeek 33

    Integration risks and test order

    Evidence: a question, sketch or new vocabulary

  2. Session 67 · Build & designWeek 34

    Integrate one subsystem at a time

    Evidence: a design draft, dataset or build

  3. Session 68 · ImplementWeek 34

    Commit every change with a clear message

    Evidence: a working version, explained once

  4. Session 69 · Test & improveWeek 35

    Run the full acceptance suite twice

    Evidence: a test log with at least one failure

  5. Session 70 · Explain & reflectWeek 35

    Report what passed, failed and was fixed

    Evidence: an individual explanation

Materials & tools
  • Capstone build
  • test log
  • Git
Minimum test

The full acceptance suite run twice; a repeat run catches regressions.

Hands-on build

A physical circuit, sensor or mechanism, built and tested on the bench.

Completion needs the artefact, an honest test log, an individual explanation and no open safety or privacy issue.

Robotics project

A physical circuit, sensor or mechanism, built and tested.

Two teachers guiding uniformed students as they build a robot car in a classroomFor school leaders

Choose a starting point.
Build from evidence.

Pick the classes and a plan. We map the timetable, kit and safety checks with you, then pilot one class first.

  • Prospectus and class-wise plan
  • Kit and readiness check
  • Pilot one class first
  • Evidence at every milestone
School enquiry

Let's plan your pilot.

Share a few details and we will send the right plan for your classes.

Classes you are considering

No spam. We reply within two working days. Prefer email? shiksha@grow10x.io